Novellus Concept One Refurbishment Items:
|
|
Mechanical
-
The system is stripped completely down to the bare
frame. The same is performed on all included power
supply and auxiliary racks.
-
All the vacuum components are cleaned according to
the manufacturer’s specifications or better. The
chambers, top and bottom plates, and other
components are cleaned to remove all residual
material. Chemical cleaning is utilized where
necessary. Sealing surfaces are resurfaced by
milling where needed, and then electro polished to
reduce the surface area so fewer gas molecules can
adhere.
-
The system frame, head, electronics assemblies, RF
Generator, and all frame and miscellaneous panels
are painted to the original manufacturer’s color and
quality specification, or to a customer specified
color combination. All controller front panels are
repainted and silk-screened.
-
All valves are removed and evaluated for operation.
Upon evaluation, each valve is rebuilt or replaced
with a newer and more efficient model.
-
All Reactor Shower Heads are removed
and replaced and the entire Top Plate Assembly is
rebuilt. The Reactor Heater Block is also replaced
with a new OEM assembly and the Wafer Spindle
Assembly is rebuilt.
-
The mechanical systems with components that wear,
such as the wafer handlers and robot assemblies,
will receive all new components. All bearings
internal or external to the vacuum chambers are
replaced. In general, all consumable parts such as
o-rings, drive belts, and other parts that age or
wear are replaced.
-
We recommend the use of Ferrofluidic feedthroughs
where applicable. By the use of these seals, the
vacuum performance is enhanced dramatically.
Another major benefit is the virtual elimination of
all maintenance concerns for these seals.
Ferrofluidic feedthroughs are available as options,
either individually or as an entire package.
-
Once the system is assembled, a pump-down period is
conducted to achieve base vacuum then a mechanical
wafer cycling is run. Each system must cycle a
predetermined number of wafers, without error,
before it is released from final test.
Vacuum
-
The mechanical pumps are sent to the original manufacturers or designated representatives for
rebuilding (this allows our customers to receive the
manufacturer’s warranty).
-
All gate and throttle valves are replaced.
-
The entire vacuum system is removed and cleaned.
All o-rings and centering rings are replaced to
ensure vacuum integrity.

Plumbing and
Process Lines
-
All utility panels are removed and serviced with
all new components. New connections are
installed and relocated, if needed, for ease of
facility connections.
-
Gas line filters are replaced with OEM specified
parts or the customer can request a certain brand
for a possible additional cost (determined by
requested manufacturer).
-
All MFCs are replaced with OEM specified parts along
with calibration tags and date calibrated.
Modifications to the type of MFCs utilized can be
requested, but an additional cost is possible
depending on brand specified.
-
All connections are color coded or labeled (i.e.
water, CDA, and gas lines) for safety and
maintainability.
Controllers and
Power Supplies
-
All controllers are repaired and tested individually
and as part of the system once the assembly process
is completed.
-
Existing controllers and power supplies can be
replaced with newer substitutes if requested. Quite
often, replacements are available that are more
reliable and readily available from the OEM without
extended lead-times. These are available as options
and are quoted separately.
-
SERT Engineers rebuild and replace the wiring
harnesses and cables so they more functional and
esthetically pleasing with service loops for all
components.
-
Controllers and peripheral equipment not
manufactured by the system OEM are sent back to the
original manufacturer for repair and calibration, if
needed.

Process
-
With regard to process, SERT Systems is prepared to
provide a machine which is partially or completely
characterized for vacuum, uniformity, and other
process parameters which encompass:
-
Vacuum Baseline reference for load lock and main
chamber
-
Initial and end vacuum level stability to
ensure repeatable films
-
Specific pump-down time (baseline)
-
Baseline vacuum with pumping curves
-
Gas pressures and flow rate
-
Deposition Rate and Uniformity
-
SERT will work closely with your Process Engineers
to achieve the desired results before the machine is
shipped. Systems utilizing toxic gases for
processing are initially tested utilizing
non-hazardous gases and final process qualification
is conducted at the customer site.
|
|